Kenco engineers conducted a cost savings analysis of a facility operated for a well-known global pharmaceutical company. One of the largest potential savings opportunities was in the lighting of the facility. The mature 154,000 square-foot facility used 400 watt, 2amp, high pressure sodium lights.



December 28, 2014
A major manufacturer in the kitchen and bath industry partnered with Kenco Logistic Services to operate a distribution center in Southern California. Since site inception, it was a struggle to find appropriate solutions to combat the growing waste charges. Stretch wrap, cardboard, cast iron, and damaged product were causing additional “overweight” waste charges. With the addition of a postponement packaging operation, an additional 1,000+ pieces of corrugated material and 1-2 bundles of plastic per day were being generated.